No much to report on in the last few days. 
This morning Drew was over cleaning up much of the debris in preparation for the insulation installation on tuesday.  There's a new pile of 2x4 for some additional framing. Kanohi enjoyed jumping on them last night. 

On friday we went to the tile store.  We are set on the entryway.  A tile that looks like slate.  Nice and dark and will contrast nice with the maple floor, stairs and railings.  The bathroom is not quite set. We were planning to do the traditional hex tile but they only make the black in a matte finish that we don't like. We'll see. 

Met with archi-Tom to get the final low-down on the railings. He had a very specific design in mind and we needed to get a clear picture on what it is. Basically a narrow open design. 