A bit more framing was done in the new basement. More wall studs, this time along the old foundation so they only go 1/2 way up. The doorway that opens into the space under the landing was framed up with wood. Drew did a nice change on his own. He moved the door location to align with the stairs to the first floor. This way when the door is open you face the back of the stairs and can use this space as storage and access the crawl under the landing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment