Over the last couple of weeks some small things have been completed.
- The exterior of the original foundation has been water proofed with tar and insulated with InSoFast panels.
- Because of the delay in the siding installation we had the sofits covered to prevent animals from potentially nesting or hanging out.
- Inside a still hot but no longer needed gas line was removed. It ran nearly the length of the house along the center support beam. Now that it is gone I can proceed with installing the sound isolation channels and hanging new drywall to finish the ceiling.
One somewhat alarming discovery - a water pipe to the basement shower that has been exposed to the hot exhaust pipe from our on demand hot water heater. The exposure has resulted in corrosion plus the exterior vent was allowing considerable air infiltration.
The water pipe will be insulated and the vent insulated with fire proof rock wool.