The photo was taken from the 2nd big rain storm which is still going as I type. The walkway stones are above the water level.
Sunday, May 29, 2011
Floodplain!
Sunday, May 22, 2011
Nearly Finished Pond
I scavenged all the rock from the walkway to the back door to complete the lower falls and walls.
Still left to go are the pump, additional rocks to line the edge along the patio, sealing the lower waterfall, installing the pipe from the roof and plants.
No plans for fish, too much work and the liner is not fish safe. Kanohi has already been playing in the pond.
To save water we'll run a pipe from the roof downspout that will empty into the pond. Hopefully we'll never have to use potable water to keep the pond full.
Sunday, May 15, 2011
Waterfall and Pond



Construction on the the waterfall and pond has begun.
Mt. Gurgas is being carved down for the water course and built up with the soil from the pond excavation.
Finally gave up on finding free blocks so i bought some for the rear retaining wall of Mt. Gurgas.
With some great stone from Madison i've expanded the berm area, replacing the small bricks with stone to form a bench. This might change.
Subscribe to:
Posts (Atom)