Friday, September 25, 2009
Dry Wall
Today the dr ywall was delivered for
installation on monday. Piles upstairs, downstairs and up against the walls. All the needed supplies as well.
All the gaps were caulked as well.
An old item. The second photo is of the north wall on the outside. It is fire rated drywall cover the SIP. Over this the exterior finish will go.
Our hope is come tuesday the drywall will be done and we'll be able to move from the living room into the new space without going outside.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Exterior Work (2016)
Design by
Tom Bassett-Dilley Architect, Oak Park
(
www.DrawingOnPlace.com)
General Contractor: Dave Heimlich
1. Removal of all old exterior siding
2. Dense pack cellulose insulation in remaining hollow walls
3. Blueskin air barrier
4. 2" thick InSoFast EPS foam board insulation
5. Hardy Board siding and trim
6. InSoFast foam board insulation of foundation
7. New sofits, facia, and gutters
8. Mechanical ventilation system
================
Interior Work (2008)
Design for the kitchen/bathroom remodel by Tom Bassett-Dilley Architect, Oak Park
(
www.DrawingOnPlace.com)
General Contractor: Drew Niermann Construction, Oak Park
Kitchen: Zimmer Hardware, Palatine, IL, 847-358-5400
Green Features:
•
Radiant Heat Floor
via existing
In-Line Hot Water Heater
•
Structural Insulated Panels (SIP)
for Walls and Roof
•
Green Roof
with ~8' deep soil
• Only using
LED
Lights
• The yard is being converted to all Illinois native plants (
woodland, savanna, prairie
)
• All rain water held on site with a rain barrel and
rain garden
.
Followers
Blog Archive
►
2016
(18)
►
October
(1)
►
July
(2)
►
June
(6)
►
April
(9)
►
2014
(2)
►
December
(1)
►
September
(1)
►
2011
(6)
►
August
(1)
►
May
(3)
►
January
(2)
►
2010
(40)
►
November
(1)
►
August
(2)
►
June
(3)
►
May
(5)
►
April
(1)
►
March
(6)
►
February
(7)
►
January
(15)
▼
2009
(110)
►
December
(18)
►
November
(12)
►
October
(20)
▼
September
(18)
Dry Wall
Dry Wall
Inspection and my head!
Done Foaming
Foam Away!
Pre Spray Photos
My Passion - ha
Doug's Passion - Insulation
Framing inspection and more
Tidying up
HVAC and more
Windows Installed
Fascination with the Porta-Potty
electrical work
Downstairs Photos
Electrical, electrical
Framing
Kitchen Sketch Up
►
August
(19)
►
July
(5)
►
June
(18)
Contributors
Michele Gurgas
doug
No comments:
Post a Comment