Thursday, June 2, 2016

Panel Install Begins

After a 5-week wait for materials work has resumed.
At the sill plate level a new board is installed around the rim of the house. Metal flashing will go over it. The InSoFast insulation panels and then the siding will go on top. 

Bye-bye blue. Panels installed up to the level of the sofit.  New cedar framing was installed around the windows.

SE corner of the house. Eventually a decorative column will be built on this corner. 

South elevation of house. 