Sunday, June 5, 2016

InSoFast Pt 2

South elevation. 90% complete. Demo and rebuilding of the sofits remains. No insulation will go on the back of the house as it is already super insulated. All the windows have been reframed to match the new depth with the insulation.  

North elevation. 

East elevation. The unconditioned attic space is also insulated rather than install spacers to have the same level for the siding.  

1 comment:

  1. How to login to my account with Bet365 in US - Dr. Maryland
    I am 순천 출장마사지 using my account from 3.2. 용인 출장샵 I can not 화성 출장안마 log in to the Bet365 app at the official site and they will 전라북도 출장샵 try to load the Bet365 app. 천안 출장마사지

    ReplyDelete