
Paul and i got back from a movie to find Michele using the tub. It is a perfect fit and holds the heat well. It is made from ground stone and epoxy so it holds heat better than the cast iron plus it is much lighter. Light enough that it is bolted to the floor.
The shower and curtain ring are installed and we need to get the curtains and then it will be fully ready.
Still let to be done are the new window, trim, cabinet and one more light.
Drew spent considerable time installing the door to the crawl space. Archi-Tom stopped by today and he, Drew, and i went over the details for the built in bench and coat rack/book shelf by the back door.
No comments:
Post a Comment