Tuesday, November 10, 2009

Trim Install Begins


Kanohi and i spent some time watching Drew cut and install some of the trim. The photo shows the trim band that will encircle the backroom (kitchen/landing).

It is hard to tell but the ceiling and area between it and the trim band is ceiling white, while the area below is an off-white.

We'll have to touch up one area of the red wall as i painted too high and it is over the trim.

This evening we finished a second coat of paint in the pantry. Used a semi-gloss since it will have dirty hand on it as we walk up and down the shelving to the access the flat roof.

The last photo was taken by Kanohi from the landing. I'm on the main floor. You can see the finished but unpainted maple railings.

No comments:

Post a Comment