They preped the concrete footer with wood for installation of the SIP walls. Hopefully, they will be able to put some up today.
Friday, August 14, 2009
Structural beam
Today they are installing the structural beam to help support the SIP roof. The back of the house is officially opened. All of the vertical 2x4's have been cut in the back wall. Kanohi's closet is emptied out into her room and the door sealed - they needed to knock that out to install the beam (see hole in upper right of photo). I am surprised by the insulation in the back (bottom right of photo). The only utility we have active to the house is a few electrical outlets. Our bathroom is officially the porta-potty in our driveway. 
Subscribe to:
Post Comments (Atom)
Re: insulation. We put that insulation in silly! When we took down the board then installed drywall on the back wall where the new shelves are.