Dry Day - lots of work
It isn't raining. Doug stopped by the house and said they are making great progress installing the
SIPs
. Photos will be posted later.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Exterior Work (2016)
Design by
Tom Bassett-Dilley Architect, Oak Park
(
www.DrawingOnPlace.com)
General Contractor: Dave Heimlich
1. Removal of all old exterior siding
2. Dense pack cellulose insulation in remaining hollow walls
3. Blueskin air barrier
4. 2" thick InSoFast EPS foam board insulation
5. Hardy Board siding and trim
6. InSoFast foam board insulation of foundation
7. New sofits, facia, and gutters
8. Mechanical ventilation system
================
Interior Work (2008)
Design for the kitchen/bathroom remodel by Tom Bassett-Dilley Architect, Oak Park
(
www.DrawingOnPlace.com)
General Contractor: Drew Niermann Construction, Oak Park
Kitchen: Zimmer Hardware, Palatine, IL, 847-358-5400
Green Features:
•
Radiant Heat Floor
via existing
In-Line Hot Water Heater
•
Structural Insulated Panels (SIP)
for Walls and Roof
•
Green Roof
with ~8' deep soil
• Only using
LED
Lights
• The yard is being converted to all Illinois native plants (
woodland, savanna, prairie
)
• All rain water held on site with a rain barrel and
rain garden
.
Followers
Blog Archive
►
2016
(18)
►
October
(1)
►
July
(2)
►
June
(6)
►
April
(9)
►
2014
(2)
►
December
(1)
►
September
(1)
►
2011
(6)
►
August
(1)
►
May
(3)
►
January
(2)
►
2010
(40)
►
November
(1)
►
August
(2)
►
June
(3)
►
May
(5)
►
April
(1)
►
March
(6)
►
February
(7)
►
January
(15)
▼
2009
(110)
►
December
(18)
►
November
(12)
►
October
(20)
►
September
(18)
▼
August
(19)
Kitchen Cabinets
Plumbing pictures
Plumbing Begins
Interior Framing
Last of the SIPs
Holy SIP!
Courtesy of our lovely neighbor - the architect
SIPs all up
Major SIP action
Dry Day - lots of work
More Details on Back
Beam and one wall/SIP up today
Structural beam
SIPs - small delay
BANG
Demo and dust
SIPs Arrive
Cabinet Removal
It begins...
►
July
(5)
►
June
(18)
Contributors
Michele Gurgas
doug
No comments:
Post a Comment