The walls are all complete for the back foundation and the front frost wall.In the last couple days they took down the forms, slathered the outside walls in black tar and put thick foam insulation panels in place.
On the inside they've put in a plastic sheet over the stone bed and then a metal wire mesh that will help strengthen the concrete floor. Don't know why they put down the plastic.

Only two sections left to underpin under the back wall of the old foundation.

We expect them on monday to pour the floor in back and front. They should be all done with the cement work by wed or thursday of next week. Right on schedule.