Under the blazing sun and high humidity they dug out two more sections of the foundation underpin. The forms for the foundation wall are up with the rebar installed. The Village has to come and inspect this work before the concrete can be poured but we are planning to pour tomorrow. The first photo is hand digging under the old foundation at the door to the basement. The red tile in the basement is sitting on this nasty plywood. I don't know if the new cement will fill the space below or not.

The second photo is the rebar going in to the old foundation. The cement in the old foundation does not look good and i could see a stream of ants moving out of it; having been disturbed by the digging.

The last photo is the mess that is our back yard.
Since I am so observant, where were the ants coming out of the concrete in the old foundation??
ReplyDelete