Today we installed the towel racks in the bathroom and moved the medicine cabinet in place. We are still waiting on the sink light. The thing has been on back order since November and Two Fish Lighting store has not called us back after two calls.
Electrical - all working correctly now.
The built in shelves are all done and look great. We've started moving items on to them.
The two interior windows now have glass in them. The pantry is much colder now since it is closed off and we are no longer loosing as much heat out the attic window.
Basement room is almost all painted.
The bad news is Drew did not finish all the interior like we told him we were expecting. Some door thresholds, door hardware, and fume hood are incomplete.
No comments:
Post a Comment