skip to main
|
skip to sidebar
Remodeling the Jowler Hut
The ongoing story of remodeling our 1919 bungalow
Friday, October 23, 2009
Supplies, supplies...
A semi of lumber arrived and our back stairs. The kitchen is now PACKED with stuff. So, it should be interesting trying to paint.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Exterior Work (2016)
Design by
Tom Bassett-Dilley Architect, Oak Park
(
www.DrawingOnPlace.com)
General Contractor: Dave Heimlich
1. Removal of all old exterior siding
2. Dense pack cellulose insulation in remaining hollow walls
3. Blueskin air barrier
4. 2" thick InSoFast EPS foam board insulation
5. Hardy Board siding and trim
6. InSoFast foam board insulation of foundation
7. New sofits, facia, and gutters
8. Mechanical ventilation system
================
Interior Work (2008)
Design for the kitchen/bathroom remodel by Tom Bassett-Dilley Architect, Oak Park
(
www.DrawingOnPlace.com)
General Contractor: Drew Niermann Construction, Oak Park
Kitchen: Zimmer Hardware, Palatine, IL, 847-358-5400
Green Features:
•
Radiant Heat Floor
via existing
In-Line Hot Water Heater
•
Structural Insulated Panels (SIP)
for Walls and Roof
•
Green Roof
with ~8' deep soil
• Only using
LED
Lights
• The yard is being converted to all Illinois native plants (
woodland, savanna, prairie
)
• All rain water held on site with a rain barrel and
rain garden
.
Followers
Blog Archive
►
2016
(18)
►
October
(1)
►
July
(2)
►
June
(6)
►
April
(9)
►
2014
(2)
►
December
(1)
►
September
(1)
►
2011
(6)
►
August
(1)
►
May
(3)
►
January
(2)
►
2010
(40)
►
November
(1)
►
August
(2)
►
June
(3)
►
May
(5)
►
April
(1)
►
March
(6)
►
February
(7)
►
January
(15)
▼
2009
(110)
►
December
(18)
►
November
(12)
▼
October
(20)
Misc. Items
ABT
Many thanks to Tom and Rick for coming by today to...
Toilet!
Stairs & Railings
Stairs and paint
Painting accomplished...
Supplies, supplies...
Tile & Water & Paint
Kanohi and came home from a trip to the local pain...
Tile sub floor and paint problem
painting begins
Cabinets Arrive
Full Access
Its a Gas (Updated)
Returned from our short vacation to Italy on monda...
Weather Tight!
HEAT
New Door too
Dry wall and half a roof
►
September
(18)
►
August
(19)
►
July
(5)
►
June
(18)
Contributors
Michele Gurgas
doug
No comments:
Post a Comment